Keystone XL Pipeline for South Dakota

The Rosebud Sioux Tribe (RST) of South Dakota retained TGG in 2015 to provide expert testimony in the Keystone XL (KXL) permit recertification case before the South Dakota Public Utilities Commission (PUC). TGG’s written expert testimony, Changes to the Economic Costs and Benefits of the Keystone XL Pipeline for South Dakota, was filed on behalf of the RST in April 2015 (and withdrawn in July 2015).

TGG’s expert report demonstrated that there had been changes in a number of important underlying facts related to economic costs and benefits of the project, since the original construction permit was issued. Based on the conclusions of pipeline safety expert Richard Kuprewicz, TGG estimated a range of worst-case scenario costs starting at US$1 billion and escalating to $2 billion or more for a very high consequence event. Given KXL’s very small employment and property tax benefits, TGG concluded that, under a range of worst-case scenarios, the costs of the pipeline would greatly exceed the benefits for South Dakota.

Background: In 2008, TransCanada proposed KXL, with a 1,179-mile (now 1,210-mile), 36-inch pipeline to carry up to 860,000 barrels per day of tar sands crude from Alberta (via Saskatchewan, Montana and the Dakotas) to Steele City, Nebraska. KXL would connect there with the existing Keystone Pipeline system, transporting the crude for delivery to the US Gulf Coast. The South Dakota Public Utilities Commission granted a construction permit for this state’s portion of KXL in 2010.

By 2011, KXL had become a flashpoint for climate activism and pipeline opponents throughout North America and was already the object of multiple legal and regulatory challenges, which delayed project construction. Since 2013, the RST has vigorously opposed the KXL pipeline through various strategies, including long-term legal and regulatory challenges, coalition-building with other KXL opponents (Indigenous, landowners and environmentalists) and protests.

Because construction in South Dakota did not begin within four years of the 2010 permit approval, TransCanada had to demonstrate to the PUC that the project continued to meet the conditions of the original permit. This recertification case attracted significant opposition, and the RST obtained intervenor status.

Update January 2016The South Dakota PUC renewed KXL’s permit, despite the the pipeline having been recently rejected at the federal level. In November 2015, President Obama rejected the pipeline (by refusing to grant the required presidential permit), concluding that KXL was not in the US national interest. The PUC’s decision was appealed at the South Dakota Sixth Judicial Circuit and then at the South Dakota Supreme Court, which dismissed the appeal in June 2018.

During the Trump presidency, legal challenges and other opposition  to KXL have again intensified. Trump signed an executive memorandum inviting TransCanada to resubmit its application for expedited approval in January 2017 (just days after taking office). In March 2017, a presidential permit was issued authorizing  KXL construction. In 2018, a federal court ruling blocked all construction of the pipeline until the State Department revised the environmental review. In 2019, the Trump Administration issued a new permit approving the pipeline. However, in July 2020, the Supreme Court upheld the 2018 federal court ruling, further delaying construction of the pipeline.

On January 20, 2021, President Biden issued an Inauguration Day executive order to rescind the construction permit for the Keystone XL pipeline. For over a decade, KXL was subject to other ongoing legal challenges by Indigenous groups, environmentalists and others in the US. Prior to its recent cancellation by the Biden Administration, construction of KXL continued to be stalled. Moreover, the economic case for the pipeline has continued to weaken. The Canada Energy Regulator (the Canadian FERC) released a report in late November 2020 projecting that if Canada strengthens its climate policies, there be no need for the capacity provided by KXL to export tar sands crude.

See Project Pages for Keystone XL Market Analysis and Keystone XL Job Study for more information about TGG’s work on the economic impacts of KXL.

On June 9, 2021, TC Energy terminated Keystone XL pipeline months after Biden revoked its permit. Alberta’s final costs for the cancelled project are estimated at $ 1.3 billion.

Update January 20, 2025: On his first day in office, Trump rescinded President Biden’s executive order revoking the KXL permit (granted by Trump in his first term), therefore offering the possibility of a revival of the project. The order has been perceived as mainly symbolic; and it is unlikely that the project would be revived in the near-term given the current economic and political climate. 

Download

WRITTEN TESTIMONY | April 24, 2015

Project Categories

Energy: Oil
Transport Mode: Pipeline
Client: Indigenous
Type: Environmental Impact Analysis, Job Study

CLIENT BRIEFINGS | 2015

SUPPORT TO COUNSEL | 2015

January 20, 2021
Biden Cancels Keystone XL Pipeline and Rejoins Paris Climate Agreement, New York Times ($)

January 18, 2021
Biden to Cancel Keystone XL Pipeline in Inauguration Day Executive Order, New York Times ($)

November 24, 2020
Canada Energy Regulator projects there may be no need for Trans Mountain expansion or Keystone XL, Financial Post ($)

November 10, 2020
The Trump Administration Is Reversing More Than 100 Environmental Rules. Here’s the Full List, New York Times ($)

October 21, 2020
Federal Judge Denies Bid to Halt Work on Keystone XL, Pipeline & Gas Journal

July 8, 2020
Is This the End of New Pipelines? New York Times ($)

July 6, 2020
Supreme Court Won’t Block Ruling to Halt Work on Keystone XL Pipeline, New York Times ($)

July 6, 2020
Supreme Court Reinstates Permit 12 but Excludes Keystone XL, Pipeline & Gas Journal

May 29, 2020
Meet the judge at the heart of the West’s top energy battles, E&E News

May 18, 2020
Biden says he’d cancel Keystone XL pipeline permit if elected, CBC

April 15, 2020
Montana judge blocks Keystone XL permit for river crossings, Bloomberg Green ($)

March 29, 2019
Trump signs permit for construction of controversial Keystone XL pipeline, Washington Post ($)

November 9, 2018
In A Setback For Trump, Judge Blocks Keystone XL Pipeline Construction, NPR

January 24, 2017
Trump Revives Keystone Pipeline Rejected by Obama, New York Times ($)

January 5, 2016
South Dakota: Keystone XL Pipeline Permit Renewed, New York Times ($)

November 6, 2015
Barack Obama rejects Keystone XL pipeline citing ‘national interest’, CBC

November 21, 2014
Native Americans, Landowners Protest Keystone XL Pipeline In South Dakota, NPR, Heard on All Things Considered